Operating Procedures For A Transformer Oil Tester
Leave a message
Your concern about the operating procedures for a transformer oil tester indicates your attention to equipment safety and testing standards, which is crucial. The following are the operating procedures for a transformer oil dielectric strength tester (the most common type), compiled based on standard procedures, applicable to most fully automatic or semi-automatic models:
Pre-Test Preparation
Environment and Instrument Check: Ensure the test environment is dry and clean, with a relative humidity not exceeding 75%, and the oil temperature is consistent with room temperature (15℃~20℃ recommended).
Check that the instrument grounding is reliable, the power cord and high-voltage line connections are normal, and the grounding post on the instrument casing is properly grounded.
Oil Cup and Electrode Treatment: Remove the oil cup and clean it 2-3 times with a clean sample of the oil to be tested to avoid residual impurities affecting the results.
Use a standard gauge (usually 2.5mm) to adjust the electrode spacing to ensure accuracy.
The electrode surface should be free of scratches and oxidation; if necessary, wipe with anhydrous ethanol and dry.
Sampling Requirements: Take oil samples from the middle of the transformer, avoiding the bottom sediment and top floating oil. The sample size should be approximately 50-100 mL, ensuring the sample is representative.
The sampling container should be clean and dry, avoiding the introduction of moisture and impurities.